Washing machine mold
价格:元
Home Appliances: Washing Machine Molds
Tumble Dryer Base (Condenser Base): Manufactured from PP125T material; the mold production lead time is 45–50 days.
Key Technical Challenges: Dimensional control; implementing targeted cooling strategies for hard-to-cool sections (utilizing zoned cooling channels within the mold); and managing pre-deformation—specifically, incorporating intentional pre-deformation adjustments at critical mounting locations.
Online inquiry