Washing machine mold
价格:元
Home Appliances: Washing Machine Molds
Control panel and door trim: These components are designed to be paint-free (pre-colored/molded-in color); the mold production lead time is 30–35 days.
Key technical challenges for the molds include: dimensional control; cooling at the door trim and door lock locations; management of weld line positioning and gate placement; and controlling deformation along the long edges of the control panel.
Online inquiry